event

Project Update



 

Change Request

 

Change Request (CR) is a formal proposal for an alteration to the system. Any request that is different from its original specification (referred herein as the signed User Requirement Specification, signed Software Design Document and signed Change Request Specification) has to be documented and evaluated in detail.

 

1.         Change Request Procedure

 

1

 

1

 

 

2.         Change Request Review Activity Schedule

 

1

 

 

3.         All CR raised is managed by 2 types Committee at MOH level

 

1

 

         Click here to download List of Change Request from Connect Manage