Network

.download_container{ width:80%; font-family:'Source Sans Pro', sans-serif; margin-left:auto; margin-right:auto; } .download_container .download-row{ width:100%; } table{ width:60%; border-collapse:collapse; } td{ padding:6px; border:1px solid #ccc; text-align:left; font-size:14px; } .style1 {font-family: Arial, Helvetica, sans-serif}

Hardware

.download_container{ width:80%; font-family:'Source Sans Pro', sans-serif; margin-left:auto; margin-right:auto; } .download_container .download-row{ width:100%; } table{ width:100%; border-collapse:collapse; } td{ padding:6px; border:1px solid #ccc; text-align:left; font-size:14px; } .style1 {font-family: Arial, Helvetica, sans-serif}

 

HARDWARE SUPPLY

 

Data Management

 

Data Management and Maintenance

 

The master data must be updated from time to time. There will be two levels of maintaining the master data i.e. either HQ or Facility level.

 

Types of master data shall accordingly be maintained by HQ level as per mentioned in PhIS & CPS Master Data. However, at the facility level, there are certain criteria must be managed efficiently by admin at the site:

 

Business Continuity Plan

 

 

Business Continuity Plan (BCP)

 

Business Continuity Plan (BCP) describes activities to be carried out in the event of PhIS & CPS system downtime at a facility in the duration of time during which the PhIS & CPS system functionalities are not available for facility user. The downtime could be due to:

♦  Inability to use the system in Partial / Total due to system failure

♦  Natural disasters

Change Management

 

Change Management

 

Prior to the implementation activities, users are exposed to the changes that will occur after going live with the system. Work process that will change is discussed and explained. The proposed Change Management Approach consists of 5 building blocks i.e. ADKAR:

 

SLA & SLG

 

SLA & SLG

 

Introduction

In the development of upgrading PhIS & CPS system, SLA has been established between the Pharmaniaga Logistic Sdn. Bhd. and the users which is define as performance standards the PLSB as a service provider obligates to meet. Below are the components regarding the PLSB services:

 

►Type of services provided

►Reliability and responsiveness of services

►Manual of reporting issues

Change Request

 

Change Request

 

Change Request (CR) is a formal proposal for an alteration to the system. Any request that is different from its original specification (referred herein as the signed User Requirement Specification, signed Software Design Document and signed Change Request Specification) has to be documented and evaluated in detail.

 

1.         Change Request Procedure

 

Implementation Plan

 

Implementation Plan

 

3 main components are outlined for the implementation of PhIS & CPS at facilities:

 

1. Infrastructure readiness

2. Data master readiness

3. User readiness

 

 

1. Infrastructure Readiness

 

Overview

Data Migration Activity

 

Data Migration

 

Objective

To ensure all data required by the application are provided in advance prior to site implementation for ease of use. Activities carried out are: 

1) Data Preparation

2) Data Uploaded

3) Data Verification

 

Data Preparation Procedure